COMMERCIALLY.× Real BrokerCANADIAN COMMERCIAL LEASE INTELLIGENCEhello@commercially.ca
LeaseCalculator.caA COMMERCIALLY PLATFORMBook a consultation
LOCATION FIT, EVIDENCE & BUSINESS COST · CANADA

Rent prices the premises.
The location prices the operation.

Compare candidate properties across nineteen operating, logistics, labour, utility, approval, resilience, flexibility and cost controls—without turning unknowns into scores.

19 DECISION CONTROLS10 DISCIPLINESNO MARKET DATA INVENTED
Canadian commercial site-selection table with three distinct property models connected to physical location evidence across a regional survey map
LOCATION DECISION INTELLIGENCE · BY COMMERCIALLY
DEVICE-LOCAL LOCATION DECISION FILE · CANADA

Compare the operating location—not just the rent.

Device-local draft

01 · DECISION MANDATE

Define what the business is actually selecting.

Keep the complete proposed use, decision horizon, markets and source requirement visible before scoring a location.

02 · COMPARATIVE READOUT

Rank fit, evidence and cost without blending them together.

Supported candidates rise first. Critical failures stay blocked even when their entered cost is lower.

ACTIVE CANDIDATES11 total in file
SUPPORTED0no critical gap in entered evidence
BLOCKED0critical failure entered
OPEN ISSUES12generated review signals
03 · CANDIDATE CONTROL FILES

Keep identity, availability and location-adjusted economics explicit.

Negative annual deltas are permitted when the entered location reduces an approved cost baseline. Every amount remains a user-entered scenario.

04 · DECISION ARCHITECTURE

Govern the questions and their weight before seeing the answer.

Nineteen default controls span ten disciplines. Edit the weight, owner and evidence standard to match the actual mandate.

01
Premises fitArea and configuration
Critical9
02
Premises fitPhysical operating fit
Critical10
03
Availability & timingAuthorized availability
Critical10
04
Availability & timingDelivery and opening timing
Critical9
05
Transportation & logisticsHighway and freight access
High8
06
Transportation & logisticsAirport, rail and intermodal access
Standard4
07
Customers & suppliersCustomer and service reach
High7
08
Customers & suppliersSupplier and partner access
Standard4
09
Labour & commuteLabour catchment
High8
10
Labour & commuteCommute and transit
High6
11
Utilities & infrastructurePower and utility capacity
Critical10
12
Utilities & infrastructureTelecommunications and service resilience
Standard4
13
Planning & approvalsUse and approval pathway
Critical10
14
Planning & approvalsTitle, access and site rights
Critical8
15
Environment & resilienceEnvironmental review
Critical9
16
Environment & resilienceHazard and resilience context
High5
17
Economics & municipal contextLocation-adjusted business cost
Critical9
18
Economics & municipal contextMunicipal tax, fee and incentive context
Standard4
19
Flexibility & growthExpansion and flexibility
Standard5
05 · EVIDENCE MATRIX

Score only what the source can support.

A pass with no source stays visible as a source gap. Verified is an entered source state, not platform verification.

Select or add a candidate to build its evidence matrix.

06 · REVIEW QUEUE

See what can still invalidate the shortlist.

These deterministic signals describe the entered file. They are not findings.

critical
The site-selection mandate is incomplete

Record the project, complete proposed use and accountable decision context before comparing locations.

high
Candidate premises identity is incomplete

Record the candidate name, complete civic address and exact premises before relying on the comparison.

Illustrative candidate — replace with sourced property
high
Area and configuration remains unresolved

Can the exact premises support the entered program and growth range?

Illustrative candidate — replace with sourced property
high
Physical operating fit remains unresolved

Do loading, clear height, parking, yard, access and building systems support operations?

Illustrative candidate — replace with sourced property
high
Authorized availability remains unresolved

Does a current authorized source support that these premises are offered?

Illustrative candidate — replace with sourced property
high
Delivery and opening timing remains unresolved

Can possession, work, approvals and opening align with the business schedule?

Illustrative candidate — replace with sourced property
high
Power and utility capacity remains unresolved

Can verified utility services support the proposed equipment and intensity?

Illustrative candidate — replace with sourced property
high
Use and approval pathway remains unresolved

Is there a supportable pathway for the complete proposed use, work and occupancy?

Illustrative candidate — replace with sourced property
high
Title, access and site rights remains unresolved

Do title, access, easement and site-control facts support the intended operation?

Illustrative candidate — replace with sourced property
high
Environmental review remains unresolved

Are environmental conditions and operating obligations understood for the decision gate?

Illustrative candidate — replace with sourced property
high
Location-adjusted business cost remains unresolved

Are occupancy and material location-driven operating costs controlled on one horizon?

Illustrative candidate — replace with sourced property
high
Location-adjusted annual cost is not established

Enter the supported occupancy case and material location-driven operating deltas before relying on PV ranking.

Illustrative candidate — replace with sourced property
FROM REQUIREMENT TO DEFENSIBLE SHORTLIST

Build the requirement. Survey the market. Prove the location.

Import the device-local Tourbook, preserve every source state, compare location-adjusted cost and move the preferred candidate into the controlled Due Diligence evidence room.