A Calgary-first land-use, development, building, completion, occupancy, business-licence and industrial-incentive source pack.
The lease can say yes.
The municipality can still say no.
Map the complete proposed use through land use, development, building, occupancy, licensing, infrastructure and incentive decisions—without turning a directory result into approval.

Control the path from proposed use to lawful opening.
Device-local approval file
Use one national control system without flattening local law.
Each pack replaces the municipal source ledger, local terminology, control-source mapping and seeded program screens. It never imports a permit conclusion from another city.
Reviewed 2026-09-18 · 3 seeded program screens · English
Municipal planning and safety-code administration with provincial legislation
Land Use Bylaw 1P2007, district rules and applicable direct-control bylaw
Development permit, tenancy/change-of-use path or applicable exemption
Building and trade permits under Alberta safety-code administration
Occupancy permit/final approval and Development Completion Permit where required
Land-use classification, development approval, building approval, occupancy, business licensing and sector permissions remain separate controls.
Compare all five jurisdiction packs, local vocabulary and lease-risk controls →
Classify the complete operation—not a marketing description.
A use label is not an approval path. Record the exact premises, every activity, material work and the opening sequence before relying on the site.
An approval is only useful at the decision gate it protects.
Each gate is cumulative. A critical unknown, expired decision or unverified required approval blocks the path regardless of the overall percentage.
Site screening
blocked0/5 complete
5 critical openLOI protection
blocked0/11 complete
9 critical openLease signing
blocked0/14 complete
12 critical openPermit application
blocked0/16 complete
13 critical openConstruction
blocked0/18 complete
14 critical openOccupancy
blocked0/20 complete
16 critical openBusiness opening
blocked0/24 complete
18 critical openControl the source before controlling the conclusion.
Calgary-first official discovery anchors are preloaded. They are not property-specific approvals and must be refreshed, narrowed and confirmed for the actual use.
municipalCalgary Land Use Bylaw 1P2007
currentCity of Calgary
municipalChanges to existing commercial and industrial buildings
currentCity of Calgary
municipalBuilding permit process and occupancy guidance
currentCity of Calgary
municipalDevelopment Completion Permit
currentCity of Calgary
municipalBuilding and development application requirement lists
currentCity of Calgary
municipalApply Calgary online services
currentCity of Calgary
federalBizPaL permit and licence finder
currentGovernment of Canada and participating governments
provincialAlberta financial supports
sourceGovernment of Alberta
federalBusiness Benefits Finder
sourceGovernment of Canada
municipalIndustrial Incentive Programs
sourceCity of Calgary
municipalGreenfield Industrial Land Development Tax Incentive
sourceCity of Calgary
municipalCommercial Clean Energy Improvement Program
sourceCity of Calgary
Separate applicability, workflow status and verification.
A submitted application is not an approval. A planning source is not a code decision. A landlord consent is not municipal permission.
01Property identity & authority · due Site screeningPremises, parcel and municipal identity
Are the exact premises, unit, parcel, municipal address and legal description controlled?
Criticalopen
Premises, parcel and municipal identity
Are the exact premises, unit, parcel, municipal address and legal description controlled?
02Property identity & authority · due LOI protectionSite control and applicant authority
Can the tenant, owner, developer or authorized agent make each required application?
Highopen
Site control and applicant authority
Can the tenant, owner, developer or authorized agent make each required application?
03Proposed use & operating facts · due Site screeningComplete activity and intensity inventory
Does the use brief include all primary and ancillary activities, equipment, storage, shifts, visitors, hazards and outdoor operations?
Criticalopen
Complete activity and intensity inventory
Does the use brief include all primary and ancillary activities, equipment, storage, shifts, visitors, hazards and outdoor operations?
04Proposed use & operating facts · due Site screeningExisting approved use and permit history
What use, occupancy and material conditions are currently approved for the exact premises?
Criticalopen
Existing approved use and permit history
What use, occupancy and material conditions are currently approved for the exact premises?
05Land use & development · due Site screeningLand-use district and direct-control rules
Which current district, direct-control bylaw and overlays apply to the parcel?
Criticalopen
Land-use district and direct-control rules
Which current district, direct-control bylaw and overlays apply to the parcel?
06Land use & development · due Site screeningMunicipal use classification
How does the authority classify every proposed activity and ancillary use?
Criticalopen
Municipal use classification
How does the authority classify every proposed activity and ancillary use?
07Land use & development · due LOI protectionPermitted, discretionary, relaxation or change-of-use path
Is the planning path confirmed for the complete use and proposed work?
Criticalopen
Permitted, discretionary, relaxation or change-of-use path
Is the planning path confirmed for the complete use and proposed work?
08Land use & development · due Lease signingDevelopment permit and conditions
Is a development permit required, and are every condition, drawing and release dependency controlled?
Criticalopen
Development permit and conditions
Is a development permit required, and are every condition, drawing and release dependency controlled?
09Land use & development · due Permit applicationAppeal, release and effective status
Has the applicable appeal or advertising period ended and has the approval been released or become effective?
Criticalopen
Appeal, release and effective status
Has the applicable appeal or advertising period ended and has the approval been released or become effective?
10Land use & development · due OccupancyDevelopment Completion Permit
Does the development approval require completion verification before use or occupancy?
Criticalopen
Development Completion Permit
Does the development approval require completion verification before use or occupancy?
11Building code & life safety · due LOI protectionBuilding occupancy classification and occupant load
Does the complete operation change occupancy classification, occupant load or code analysis?
Criticalopen
Building occupancy classification and occupant load
Does the complete operation change occupancy classification, occupant load or code analysis?
12Building code & life safety · due Lease signingBuilding-permit scope
Which alterations, repairs, equipment, racking or changes in use require a building permit?
Criticalopen
Building-permit scope
Which alterations, repairs, equipment, racking or changes in use require a building permit?
13Building code & life safety · due Lease signingLife safety, accessibility and exiting
Are fire protection, exiting, accessibility, washrooms and occupant-safety requirements resolved for the intended use?
Criticalopen
Life safety, accessibility and exiting
Are fire protection, exiting, accessibility, washrooms and occupant-safety requirements resolved for the intended use?
14Construction & trade permits · due ConstructionElectrical, plumbing, gas, mechanical and fire permits
Which trade permits and qualified contractors are required for the complete work?
Highopen
Electrical, plumbing, gas, mechanical and fire permits
Which trade permits and qualified contractors are required for the complete work?
15Construction & trade permits · due ConstructionInspection and deficiency sequence
Are required progress, final and specialist inspections sequenced to the opening date?
Criticalopen
Inspection and deficiency sequence
Are required progress, final and specialist inspections sequenced to the opening date?
16Occupancy & opening · due OccupancyOccupancy permit or final building approval
Which final building approval is required before occupancy, and has it been issued without unresolved conditions?
Criticalopen
Occupancy permit or final building approval
Which final building approval is required before occupancy, and has it been issued without unresolved conditions?
17Occupancy & opening · due Business openingMunicipal business licence and land-use approval
Which municipal business licence and associated land-use approval are required before opening?
Criticalopen
Municipal business licence and land-use approval
Which municipal business licence and associated land-use approval are required before opening?
18Licensing & sector regulation · due Business openingSector, health, fire and operational licences
Which sector-specific registrations, licences, inspections or approvals apply to every activity?
Criticalopen
Sector, health, fire and operational licences
Which sector-specific registrations, licences, inspections or approvals apply to every activity?
19Licensing & sector regulation · due Business openingEnvironmental and hazardous-material approvals
Do emissions, discharges, waste, dangerous goods, fuel, chemicals or storage trigger separate approvals or reporting?
Highopen
Environmental and hazardous-material approvals
Do emissions, discharges, waste, dangerous goods, fuel, chemicals or storage trigger separate approvals or reporting?
20Licensing & sector regulation · due Business openingSigns, yard, outdoor storage and accessory activity
Are signs, outdoor storage, parking, loading, fences and accessory uses separately permitted?
Highopen
Signs, yard, outdoor storage and accessory activity
Are signs, outdoor storage, parking, loading, fences and accessory uses separately permitted?
21Infrastructure & environment · due LOI protectionUtility availability, load and metering
Can confirmed electrical, gas, water, sanitary, storm and telecom capacity support the actual operation?
Criticalopen
Utility availability, load and metering
Can confirmed electrical, gas, water, sanitary, storm and telecom capacity support the actual operation?
22Infrastructure & environment · due LOI protectionServicing, access, loading and transportation
Do approved access, loading, parking, circulation and servicing plans support the operating envelope?
Highopen
Servicing, access, loading and transportation
Do approved access, loading, parking, circulation and servicing plans support the operating envelope?
23Infrastructure & environment · due LOI protectionEnvironmental site and resilience constraints
Have contamination, flood, drainage, geotechnical, environmental and resilience constraints been scoped for the site and use?
Criticalopen
Environmental site and resilience constraints
Have contamination, flood, drainage, geotechnical, environmental and resilience constraints been scoped for the site and use?
24Construction & trade permits · due Permit applicationPlans, professionals and complete submission team
Are sealed plans, surveys, studies, contractors and application responsibilities complete for the selected path?
Highopen
Plans, professionals and complete submission team
Are sealed plans, surveys, studies, contractors and application responsibilities complete for the selected path?
Discover broadly. Count narrowly.
Potential value, probability-weighted pipeline, conditional credit and sourced executed award credit remain separate. A directory result is never eligibility or funding.
Active records before eligibility and award control.
User-entered scenario probability—not an expected award.
Supported qualification but no executed award.
Approved inclusion with sourced executed award.
GrantCalgary Industrial Development Incentive Program
Discovering$0
Tax exemptionGreenfield Industrial Land Development Tax Incentive
Discovering$0
FinancingCommercial Clean Energy Improvement Program
Discovering$0
Carry unresolved approvals into the transaction—not into opening day.
The Due Diligence handoff creates unverified evidence and one risk per incomplete critical control. It never upgrades an approval conclusion.
- critical
Exact premises are not identified
Approval research must be tied to the exact premises, parcel and unit.
- critical
Complete proposed use is missing
List every primary and ancillary activity before classifying the approval path.
- critical
Premises, parcel and municipal identity is not controlled
Applicability remains unknown at or after its required stage.
- critical
Complete activity and intensity inventory is not controlled
Applicability remains unknown at or after its required stage.
- critical
Existing approved use and permit history is not controlled
Applicability remains unknown at or after its required stage.
- critical
Land-use district and direct-control rules is not controlled
Applicability remains unknown at or after its required stage.
- critical
Municipal use classification is not controlled
Applicability remains unknown at or after its required stage.
No upload. No permit filing. No eligibility or opening conclusion.
This device-local workspace organizes user-entered proposed-use facts, authority sources, approval records, deadlines, incentive screens and workflow decisions. It does not search every applicable law or authority, classify a use, determine whether an approval is required, submit an application, reserve program funding, confirm eligibility, establish lawful occupancy, interpret a lease, provide legal or planning advice, or represent that a property can open. A completed control means only that the entered source and verification requirements are present. Confirm the current path with the applicable authority and qualified legal, planning, code, engineering, environmental, tax and other advisers.
Choose the site. Protect the lease. Prove the opening path.
Import the preferred location, preserve current authority sources, separate approval from submission and carry every unresolved blocker into the controlled evidence room.