What needs work.
Who pays. When.

Turn building-condition notes into an editable maintenance and replacement plan. See the cost range, lease questions and funding gaps before a surprise invoice.

Read the practical Canadian guide
Architectural tabletop cutaway of a commercial building with roof, HVAC, loading systems and condition-planning cards
Build a plan you can actually discuss.

Start with an example, replace its assumptions, then see the cash and unanswered questions.

An illustrative five-year plan with seasonal servicing, dock repair and a roof replacement. Compare direct tenant payments with a separate, unconfirmed amortized recovery scenario. Examples are fictional—not quotes, required service intervals or lease advice.

Whole-building work$310,822$229,409–$433,209 entered range
Tenant cash$53,073Direct payments + modelled recovery
Owner net cash$257,748After tenant direct payments and recovery
Extra reserve funding$146,692Timing matters—not just the final balance
6 priority review items0 urgent systems · 0 overdue inspections · 1 systems with unclear responsibility
1 · SET THE PLANNING WINDOW

Which property, how long, and whose reserve?

This is a cost and responsibility plan. It does not decide whether a building is safe, compliant or suitable for your use.

Check whether cash is ready when work is due.

Do not count the same cost twice.

Use this plan to identify building work. If the same work is already in a tenant-improvement, restoration, operating-cost or underwriting model, reconcile it before combining totals.

1 of 5
What this tool does—and what it cannot confirm

This device-local plan organizes user-entered building, lease, inspection and cost records. It does not inspect a building, establish safety or code compliance, predict failure or remaining useful life, interpret a lease, establish cost recovery, replace a qualified professional, or book or complete work. A condition label or 'supported' recovery status is your recorded assessment, not independent verification. Do not defer a suspected safety issue because a budget schedules it later.

Device-local: saving stays in this browser. It is not shared, encrypted cloud storage, an inspection booking, a notice or a work order. Use approved systems for confidential documents.

  • All dollars are entered Canadian-dollar scenarios. Sales taxes, rebates, insurance proceeds, financing, markups and contingency are not added unless included in your entered costs.
  • Month 1 is the calendar month containing the plan start date. Costs occur in their entered month; present value assumes end-of-month cash. Calendar-year totals can include a partial first or last year.
  • Annual-compound work costs use plan-start dollars and the row's entered annual rate with fractional-year compounding from month 1. Periodic-step costs change only at the entered first change month and each entered interval; the row percentage is per change, not automatically annual. Fixed-future costs are already entered future amounts and receive no escalation. The plan rate is a default for new work, not an extra rate added to existing rows. No rate or timing is inferred from condition or location.
  • Inspection, maintenance and repair are grouped as non-capital planning cash; replacement and improvement are grouped as capital planning cash. These are tool groupings, not accounting or tax classifications.
  • The full building cost is counted once. Tenant direct payments reduce owner-funded cost; recovery is applied only to the remaining owner-funded cost. Recovery status flags do not authorize billing.
  • Each recurring occurrence can create its own recovery stream. Amortized recovery uses a level monthly payment with entered nominal annual interest divided by 12; 0% interest divides principal evenly. Recovery cannot start before its work occurrence.
  • Only in-horizon recovery is included in tenant and owner cash. Remaining recovery is shown separately without assuming collection, continuing tenancy or legal entitlement.
  • Reserve contributions arrive at the start of each month. The selected scope uses net cash after in-horizon recovery, so receipts can replenish the reserve. No reserve interest, external top-up or borrowing is assumed. Additional funding is the largest cumulative deficit.
  • Completed work is retained in the file but excluded from future planned cash. Condition, evidence and responsibility labels are user-entered records, not independent verification.